Top Products
Filter by
Didn't find what you are looking for? We're here to help!
137 Item(s) found
In this webinar, we demonstrated how easy it is to convert to ETAP 22 from various legacy software applications using the most advanced built-in data conversation tool. We also explored many of the new features & capabilities in ETAP 22 and revealed tips and tricks for the best ETAP experience.
ETAP Train Power Simulation - eTraX™ software includes validated, user-friendly and flexible software tools for designing, analyzing and managing AC and DC railway infrastructure. Learn how eTraX integrates with ETAP protection & coordination software (StarZ) to?offer insights into line protection, protective relay performance & evaluation, troubleshooting false trips, and system-wide protective device operation.
ZSI (Zone Selective Interlock) Scheme has been developed about 40 years ago and since then, the application has expanded from Protection to Arc Flash Hazard Mitigation and even Coordination or Selectivity.
ETAP Star™ is an easy-to-use, interactive, and powerful platform for overcurrent protection and coordination studies. Supported with 100+ thousands of verified and validated protective device and equipment library models from manufacturers across the world, simulation and analysis of any network are at your fingertips. Learn about the intuitive and efficient approach for the creation of Time-Current Characteristic Curves and the program’s artificial intelligence (AI) for protection and coordination or selectivity analysis.
In this webinar, we introduce ETAP Unbalanced Network Short Circuit Analysis and demonstrate how to evaluate the impact of shunt and sliding faults on balanced and unbalanced networks: *Device Duty Evaluation for multi-phase, single-phase, AC & DC systems * Run and evaluate all fault types in one study * Shunt, series, and simultaneous faults * Simulate protective device responses to fault currents and configuration changes Unbalanced Network Short Circuit Standards: * ANSI C37.10 for AC systems * IEC 60909 for AC systems * IEC 61660 for DC systems
Learn about ETAP ArcSafety, an all-in-one AC & DC arc flash solution for LV, MV & HV systems that improves safety, reduces risk, minimizes equipment damage, and validates mitigation techniques.
In this video, we demonstrate how to use ETAP’s Lightning Risk Assessment (LRA) module to assess the risk of a lightning strike and the probability of damage. Learn about the LRA calculation methods used in ETAP and how to perform the LRA to comply with internationals standards NFPA 780-2020, 2014 and IEC 62305-2: 2010. Explore the important reasons behind Lightning Risk Assessment. From lightning as the number one cause of power surges, to preventing damage, fires and other harm to lives and property, accounting for unpredictable weather patterns and asset protection, as in buildings, power infrastructure, and human lives, ETAP's Lightning Risk Assessment module will calculate the possible risk to humans and infrastructure.
Learn how ETAP DC Arc Flash Analysis software calculates the incident energy for photovoltaic systems, while considering different methods such as Maximum Power, Stokes and Oppenlander, Paukert, DGUV-I-203-077. This presentation shows how ETAP applies the DC arc incident energy models developed in IEEE "Methods for Evaluating DC Arc Incident Energy in Photovoltaic Systems"
Learn how engineers use ETAP Harmonic Analysis software to simulate harmonic current and voltage sources, identify harmonic problems, reduce nuisance trips, design, and test filters, and report harmonic voltage and current distortion limit violations on balanced or unbalanced systems. Additionally, for transmission and distribution system operators, Harmonic Grid Code automates harmonic analysis for detailed power quality assessment reporting demonstrating the generation facility is designed to comply with applicable harmonic limits. Study reports include worst-case incremental and total harmonic distortion, frequency-dependent Thevenin Equivalent at PCC, and color-coded impedance loci charts.
The variable nature of renewable energy introduces power quality concerns, including frequency and voltage control, that may negatively impact the reliable performance of a power system. Grid codes, interconnection, or evacuation criteria must be followed during the proposed system design and continue to maintain compliance under grid-connected operation. ETAP Grid Code is a model-driven solution that includes software tools and control hardware to ensure local grid codes or standards compliance throughout the power system design and operations lifecycle.