欧美A片

Metals & Mining

?? ? ??? ??? ??? ?? ???? ???? ???? ??? ETAP? ?????. ETAP ???? ???? ???? ?? ??? ??? ??? ??? ?? ??? ?? ??? ?????. 
  • ??? ? ???

    ??? & ???

    ??? ????? ?? ?? ???? ??? ??, ??? ?? ? ???? ?? ?? ??? ?? ??? ???

  • ?? ? ???

    ?? & ???

    ?? ???? ?? ???? ????? ? ??? ???? ?? ?? ?? ? ??? ??

  • ?? ?? ? ??

    ?? ??? & ??

    ?? ???? ??? ? ??? ??, ?? ? ????? ?? ???? ???

  • ?? ? ??

    ?? & ??

    ?? ?? ? ?? ?? ??, ?? ? ???? ?? ??? ???? ?? ?????

  • ?? ?? ???

    ?? ?? ???

    ???? ????, ?? ????? ? ?? ??? ???? ?? ?? ?? ?? ???

  • ?? ?? ???

    ?? ?? ???

    A smart load shedding system must have the same understanding of the electrical network as the engineers who designed and analyzed it.

??? ??

????? ?? ??? ??? ??? ??? ??? ?????. ???? ???? ???? ???? ?? ?? ??? ?? ????? ???? ??? ??? ?? ???? ??? ??? ??? ??? ??? ????. ?? ??? ??? ??? ????? ???? ????, ????? ??? ??? ? ?? ????    ???? ?? ??????. ETAP ??? ????(ILS) ???? ?? ??? ???? ????. ETAP ILS? ?? ??? ?? ??? ?? ??? ??? ?? ?? ??????.

??? ?? ?? ?? ???? ???? ?? ??? ?? ??? ?? ??? ?? ??? ???? ??? ???????. ?? ??? ????(ILS)? ?? ??? ?? ???? ???? ??? ????? ????? ???? ??? ?? ??? ?????? ??? ??? ??? ??? ????. 

Metals and Mining User Logos
#benfitalt#

Tutorials

Protection Coordination at Panama Mina de Cobre

Design and commission of a green-site power system including protection coordination for the entire site and implementation of IEC61850 communications, inter-tripping, inter-locking and protection blocking schemes.

Ground Grid Design with ETAP in a Steel Plant in Mexico  - EPSOL

A Ground Grid design project is presented in a steel plant in Mexico and the objective is to reduce the step and touch potentials in the area of ??electric arc furnaces of 50 kA connected to transformers of 13.8/0.6 KV and that in the moment of melting, they create dangerous currents for the workers who operate these furnaces. The project is executed from the field measurements of the resistivity of the ground and the design of the ground grid with the ETAP finite element method (FEM) and the construction of the grid is executed up to the foot of the ovens, thereby reducing said potentials to safe values ??for the workers, contributing to a safer work area.

How ETAP was utilized  to  expand  the Electrical System at the Tailings Dam Copper Mine in Peru

As part of their Tailings Dam Expansion project, a large copper mine in Peru required to have several studies performed in their electrical system. As loads were added and the topology of the system was changing, the client wanted to ensure that their electrical system would be able to handle the new loads and operate reliably and efficiently. Electro Integra S.A.C. was hired to perform Load Flow, Short Circuit, Relay Coordination, Motor Starting and Optimal Capacitor Placement studies. ETAP was used as the tool to perform all the studies because the client has been using ETAP for over 20 years.

Since 2000, Electro Integra has partnered with ETAP to bring their software solutions to the Peruvian market. Continuous development and investment in ETAP 欧美A片 has kept them as the de facto standard for power system analysis for all types and sizes of electrical industries.

Brochures

White Papers